Skip to content
Book an inspection
  1. Home
  2. Builder Maintenance Period Reports

Maintenance period inspections ยท Perth

Builder Maintenance Period Reports

A written, photographed list of everything your builder still owes you. It is prepared by registered builders before the maintenance liability period ends, for new homes across Perth and the South West.

Family carrying boxes into their newly built home

Why this period matters

Your builder's last obligation, made to count

After you move in, the maintenance liability period is when the builder returns to fix defects under their liability and warranties. They must rectify any work that does not comply with the National Construction Code (NCC, formerly the BCA).

Items missed now often stay missed until you sell. By then, getting the builder or their insurer to act is slower and can cost you more.

  • A specific list the builder can act on, not a vague complaint
  • Roof void checked, the area most often left incomplete
  • Photographed findings and a phone debrief for every client

Inside the report

What the report lists for your builder

Each of our inspectors has more than 40 years in residential building. They know where to look, and how to write each item so it gets fixed.

Unfinished and defective work

Every item that still needs attention is identified and listed, from incomplete finishes to defects that have shown up since you moved in.

The roof void, checked properly

Roof voids are often the most neglected area at handover. We go up and record any unfinished work or defects that were missed before.

Work that does not meet the NCC

We record items that fall short of National Construction Code standards. The builder has an obligation to rectify these.

A clear report the builder can act on

The report is written plainly and photographed, so each item is specific. We then talk you through the findings by phone.

Questions

Booking your maintenance period report

When in the maintenance period should I book?

Book as the period approaches, so you have the report before the builder's maintenance visit. That leaves time to send it to the builder and for them to schedule the work while they are still liable. If you are unsure when your period ends, check your building contract or call us on 0428 465 104.

I have already given my builder a list. Do I still need a report?

Your own list is a good start. It rarely covers the roof void or work that does not meet the NCC, because both are hard to reach and judge without building experience. A professional report adds those items. It also gives your list the weight of a registered builder's findings, so it is harder to dismiss.

What if my builder is no longer trading?

The defects can still be inspected and recorded. Without the builder, getting the work fixed usually has to go through their insurance. That can take longer and involve more paperwork, so a clear written record of each defect matters even more. Call us to talk through your situation.

Book your maintenance period report

Give your builder a clear, photographed list before their liability period ends. We inspect new homes across Perth and the South West.

Call 0428465104Get a quote