Lock up Stage Property Inspection

Building under construction inspection services

It is at this stage that bricks and mortar are looking more like home so it is important to make sure the building can be secured to prevent unwanted casual entry. From now on internal fixtures and finishing’s are being installed and with a secured building they can stay that way.

Before these fixtures get installed it is important to make sure the construction up to this stage has been carried out with good building practises and meet Australian Standards; are ceiling installations & wall finishes good, are electrical and plumbing services correctly positioned, how is the general appearance? These and other questions can be answered by engaging a Housecalls “Lock-up” stage building inspection, our inspection reports have been developed by the Housecalls team from many years of experience as practising builders, they are designed to provide you with the best information available in an easy to read and understand format for this “Lock-up” stage of the construction.

“There is no house more beautiful than the house you happily live in!” ― Mehmet Murat ildan

Our lock up stage inspections covers the below items

Cleanliness

Visual Condition

– Roof battens – secured
– for tiled roof
– Roof battens – secured
– for metal roof
– Paired rafters
– Collar ties
– Under purlins
– Struts
– Valley timbers
– Hip rafter timbers
– Jack rafter timbers
– Support beam timbers – bearings and support
– Ceiling joist timbers

– Surface finish
– Angle beads
– External corner finish
– Internal corner finish
– Reveals square

Front Entry door
– Temp door and lock installed and secure
– Contract specified door and lock installed and secure

Shopper Entry door
– Temp door and lock installed and secure
– Contract specified door and lock installed and secure

Rear Entry door 1
– Temp door and lock installed and secure
– Contract specified door and lock installed and secure

Rear Entry door 2
– Temp door and lock installed and secure
– Contract specified door and lock installed and secure

– Bathroom 1
– Bathroom 2
– Kitchen
– Laundry
– WC

– Main Bathroom
– Ensuite Bathroom

 

– Roof perimeter restraint strapping and tensioning
– Tie-down rods securing and positioning
– Under purlin to strut ties
– Under purlin to rafter ties
– Rafter to Ridge ties
– Support beam steel – bearings and support
– Sole timber plate to steel beams bolted
– Ceiling joist to hanging beam ties
– Wall plate to wall head
– OtherRoof Plumbing
– Gutters – Joints
– Fascia
– Rainwater pipes – positions
– Flashings
– Valleys
– Roof vent penetrations

– Finish
– Back blocked to AS2589

Lighting
– Switch positions
– Ceiling positions
– External positions

Power – GPO’s
– Wall positions
– External

– Glazing installed
– Opening units installed and operational
– Window locks installed
– Extrusion condition – External
– Extrusion condition – Internal

– Tiled /Metal roof
– Visual appearance & fitment
– Ridge/hip capping – fitting to metal roofs
– Ridge/hip capping – Tiled roof mortar pointing – finish

– Surface finish
– External corner finish
– Internal corner finish
– Reveals square
– Wall return angles

Roof Installation
– Pipes clipped
– General pipe run layout

Wall Installation
– Outlet positions
– Pipes in wall lagged

External services
– Outside tap positions